Taught by Sr Loo Seong King.
Why Measurement IV?
The prerequisite of this module is Measurement III. In Measurement IV, we learnt another new range of measurement which we will need in future QS job. We gain the ability to analyse data from various drawings(architectural & engineering) and tender documents. It also helps us to familiarize the nature of tendering process and contractual documentation. Other than that, the assessment has help us revise back Measurement I ~ Measurement III.
Learning Outcome?
1. Measurement of:
Surface Water Drainage
Sewerage Reticulation (Sewer Drainage)
Bored Piles
Road & Pavement
Water Reticulation
Renovation and Demolition Work
2. Production of the whole tender documents
Form of Tender
Instruction to Tenderer
Conditions to Tendering
Agreement and Conditions of PAM Contract 2006 (with quantities)
Preliminaries
Preambles
Specification
Taking-off
Bill of Quantities (Main Building Work & External Work)
Prime Cost Sum
Provisional Sum
Banker's Guarantee for Tender Bond & Performance Bond
Schedules
List of Drawings
3. Production of Elemental Cost Analysis
Form 1: Information on Total Project, Analysis of Single Building
Form 2: Element Costs
Form 3: Specification
Assessments Components?
1. Midterm Test 20%
2. Group Assignment 1 20%
3. Group Assignment 2 10%
4. Final Exam 50%
5. E-porfolio Pass/Fail
Group Assignment 1?
This will be group project where a group of 6 students will measure all elements of a double storey building including production of Bill of Quantities and culminating in the preparation of a set of Tender Documents for calling for tender.
Group Assignment 2?
This will be an Elemental Cost Analysis (ECA) Workshop where a group of up to 8 students will prepare detail cost analysis of a building project culminating in the preparation of a ECA report.