QSB60103 Construction Technology II



Taught by Mr. Chai Voon Chiet.

Learning Outcome: Excavation, Soldier pile and lagging, Contiguous bored pile, Retaining wall, Diaphragm wall, Trench shoring system, Pile foundation, Continuous flight auger(CFA) piles, Precast concrete piles, Pile caps, Pretensioned spun concrete piles, Scaffolding, Portal frame, Structural steelworks frames, Precast concrete, Partitions, Suspended ceilings

Individual assignment 1: Sketch and Draw x 20 pieces












Group assignment: Video “Walls” x 20 minutes



I very appreciate Mr. Chai's teaching. He taught us a lot not only from the lecture notes but also many related knowledge from his working experience. What we gain from him is very useful to us. Construction Technology 2 is getting more difficult than I thought. Other than lecture classes, I should make efforts and take times to revise every topic myself in order to digest. Construction technology is always my favourite module!