QSB60204 Measurement II
Taught by Ms. Habizah Binti Sheikh Ilmi
Learning Outcome: Measurement of Wall element(Internal and External), Wall finishes(Internal and External), Floor finishes, Ceiling finishes, Timber floors and Stud partitions, Staircase structure, Staircase finishes and Balustrading, Precast concrete piling
Why Measurement II? Compared to Measurement 1, Measurement 2 is more related to building a house while Measurement II is concentrating on site clearance, foundation and reinforcement bar, the basic work before building a house.
Assignment?
Group assignment 1: We are given a bungalow to measure by Ms. Habizah. Being in group have the benefit of distribution of works and motivation by others. I also gained the knowledge of 5 person when we work the project together. I felt lucky because I've get to know my classmates more and then we become good friends!
Photos of Group Assignment: Bungalow Class D (part of the plan)
I can't imagine how difficult the project is in our real work in the future as a quantity surveyor. I feel like I always didn't learn that much and I definitely need to practice more and more and gain the knowledge of not only in the field of QS but also engineering, marketing, English language etc. as much as I can. I don't hope much, if I can keep understand the real me that's what I really hope, I believe knowledge leads me to this way..
订阅:
博文评论 (Atom)
Popular Posts
-
QSB60704 Building Services and Civil Engineering Quantities (Measurement 5) Taught by Mr. Chee Wai Meng & Ms. Laura Law & Mr. Lo...
-
Taught by Mr. Chai Voon Chiet. Learning Outcome: Excavation, Soldier pile and lagging, Contiguous bored pile, Retaining wall, Diap...
-
Taught by Soon Lam Tatt. Learning Outcome: Different types of Windows, Different types of Doors, Structural Steelworks and Metalwork, ...
-
QSB60804 Building Economics Taught by Ms. Dianne Kok Hui Wei Learning Outcome 1. Introduction to Building Economics 2. Concept of Co...
-
Taught by Tan Hee Chai. Learning Outcome: Ventilation, Air-conditioning system, Fire protection in building, Electric supply and distr...
-
Taught by Ms. Habizah Binti Sheikh Ilmi Learning Outcome: Measurement of Wall element(Internal and External), Wall finishes(Internal an...
-
Taught by Sr Loo Seong King. Why Measurement IV? The prerequisite of this module is Measurement III. In Measurement IV, we learnt anoth...
-
QSB60904 Professional Practice II Taught by Mr. Lim Sek Cheon Learning Outcome 1. Construction Disputes 2. Delays and Disputes 3. Co...
-
QSB4224/QSB60303 Development Economics Taught by Ms. Tay Shir Men & Mr. Soon Lam Tatt About this module Introduce the devel...
-
Taught by Ms. Ang Fuey Lin. Learning outcome: Measurement of girth, site clearance, strip foundation, pad footing, pile cap, colum...